01Hood and make-up air that actually balance
A Type 1 hood pulls thousands of CFM out of your kitchen. If nothing puts that air back, the front door gets hard to open, the dining room goes negative, and your gas appliances stop behaving. We size make-up air against the exhaust at design stage, and we coordinate the hood, the fire suppression, the roof curb and the structural opening as one package — so the mechanical permit does not stall waiting on a drawing nobody owns.
02Grease interceptors and the drainage nobody sees
Floor drains, trench drains and an interceptor mean cutting the slab, and the sanitary stub is rarely where your kitchen wants it. We core, trench, run new drainage and re-pour rather than building the line up on a platform your staff trip over for a decade. Doing the under-slab work first also keeps the plumbing and health inspections in the order the inspectors expect them.
03Health-unit review booked at the start, not the end
The local public health unit reviews your plans before construction and inspects before you serve food. Leaving that submission until the room looks finished is the most common reason an opening date slips. We submit early, build to what was approved, and walk the inspector through the space ourselves so a comment becomes a same-day fix instead of a re-book.
04Barrier-free washrooms that pass the first time
The Building Code’s barrier-free requirements decide how much of your floor plate the washrooms eat, and that changes your seat count. Clearances, door swings, blocking for grab bars, counter and fixture heights all get set before we frame — because moving a washroom wall after the tile is on is the most expensive change in the job.
05A fixed opening date to build to
Your lease has a rent-commencement date and your marketing has a launch. We release long-lead items — hood, walk-in, custom millwork, storefront glazing — in the first week, and run permits in parallel with demolition rather than after it. When something does slip, you hear it from us the week it happens, not the week before you open.
06Patios, storefronts and the licences behind them
A patio is rarely just a railing. Municipal patio or boulevard-café approval, an AGCO amendment to your licensed area, an accessible route and, on some streets, heritage or site-plan review can all attach to the same twenty feet of sidewalk. We flag which of those apply to your address early, because each one runs on its own clock and none of them care about your build schedule.